Birat Medical College
Campus water treatment + drinking-water RO across teaching and residential blocks.

Brief
The job, in one paragraph.
A medical college campus in Biratnagar needed unified water across teaching blocks, the attached hospital, and faculty and student residences — drinking-water RO at every tap, inlet treatment for the building plumbing, and a single service relationship across the lot.
The challenge
What needed fixing.
Mixed feeds (municipal supply with borewell augmentation), inconsistent hardness and iron between blocks, ad-hoc jar deliveries for drinking water, and no preventive service infrastructure. Four supplier relationships, none of them the same.
The solution
What we built.
A campus inlet WTP (sediment → iron → carbon → softening) sized to peak student and patient occupancy, plus centralised drinking-water RO with re-mineralisation distributed to point of use across the teaching, ward, and residential blocks. Comprehensive AMC from handover: monthly preventive visits, parameter testing at every tap, same-day reports.
By the numbers, after handover.
Jar deliveries since install
Supplier relationships consolidated
SLA on flagged faults
Service visits a year
“We replaced four supplier relationships with one. The water is the same in the lecture halls, the ward, and the residences.”
— Operations head, Birat Medical College
Photographs
On site.






Related case studies
Other healthcare installations.
Have a similar challenge?
Submit an RFQ with your site details. We'll respond within one business day.
Or call +91 97487 45193