Charnock Hospital
Drinking-water RO at point of use, building inlet WTP, monthly AMC.
Brief
The job, in one paragraph.
A multi-specialty hospital in Kolkata required a unified water programme: drinking-water RO at point of use across wards and OPDs, plus building-inlet treatment to protect the campus’ long-running plumbing and equipment.
The challenge
What needed fixing.
The existing setup was fragmented: jar deliveries for drinking water, no inlet treatment, and scale and iron staining building up in the laundry and CSSD. AMC was on-call, not preventive. Equipment downtime was rising with no early-warning visibility.
The solution
What we built.
Uniwater installed a building inlet WTP (sediment, iron-removal, carbon, softening) sized to peak occupancy, and centralised drinking-water RO with re-mineralisation distributed to point-of-use at ward and OPD level. Comprehensive AMC was contracted from handover: monthly preventive visits, same-day documented reports, 24-hour SLA on flagged faults.
Outcomes
By the numbers, after handover.
Jar deliveries since install
Hardness at every tap, post-softening
SLA on flagged faults
Service visits a year
Photographs
On site.






Related case studies
Other healthcare installations.
Engineering brief
If your site sounds similar, send us the details.
Submit an RFQ with your site details. We'll respond within one business day.

