Saburi Plywood
Boiler feed water DM plant + cooling-tower make-up RO.
Brief
The job, in one paragraph.
Saburi Plywood’s manufacturing plant near Kolkata operates steam-cured presses for the marine and block-board lines. Boiler feed and cooling-tower make-up were drawn from bore-wells with high hardness and inconsistent iron.
The challenge
What needed fixing.
Boiler scaling was forcing an unplanned chemical descaling every six months. The cooling-tower fouling rate was high enough that the operations team was budgeting tower-fill replacements every year, which is abnormal for a plant of this size.
The solution
What we built.
Installed a 4,000 LPH DM plant for boiler feed (acid-cation + base-anion + mixed-bed polish) and a 10,000 LPH commercial RO for cooling-tower make-up. Antiscalant dosing on the RO; monthly conductivity and silica checks on the DM. Both lines covered by a single Comprehensive AMC.
Outcomes
By the numbers, after handover.
Boiler descaling interval (was 6)
Reduction in cooling-tower blowdown
DM polish-grade water
Service visits a year, by name
Photographs
On site.






Related case studies
Other manufacturing installations.
Engineering brief
If your site sounds similar, send us the details.
Submit an RFQ with your site details. We'll respond within one business day.

