For architects & interior designers
Engineered home water, specified into the build.
Pre-tile design. DWG, BIM, install drawings. A single survey-led partner from villa-level treatment to mid-rise WTP. So the fittings you specified perform the way the brand intended.
Are you a plumber or installer instead? Visit the plumber program →

Why specify Uniwater
Three things specifiers actually need.
Spec into the plan, not after tile.
A whole-house treatment system designed during construction routes plumbing cleanly, sites the plant in the utility area, and stays invisible. Specified after tile is repair work. Specified before tile is engineering.
A single supplier across the build.
One survey. One BOM. One handover. One AMC. From bathroom-level BathSoft up to building inlet WTP for the whole project, we are the same engineering team — not three vendors.
Documentation that holds up to scrutiny.
DWG vessel footprints, BIM blocks for the major capacities, install-location drawings, technical PDFs for procurement. Submittal-grade, version-controlled, available before tender.
Spec library
Everything you need on your drawings.
DWG, BIM, install drawings, and technical PDFs covering the full residential and building range. Submittal-grade documentation, version-controlled, available on request until the partner portal ships.
DWG and PDF, every capacity from BathSoft Mono to HomeSoft 6K and the 8K–30K LPH building bands.
Revit families for the residential and building plant capacities. Layered for plumbing, electrical, structural.
Architectural sections of the five install patterns — false ceiling, plumbing shaft, wall recess, under-counter, utility room.
What to test, when to test, what plumbing routes to leave open, what utility-room dimensions to plan for.
Per-product data sheets with capacities, materials, dimensions, AMC scope. Submittal-ready.
Bundled assets per project type — villa, mid-rise, gated complex, boutique hotel.
Request packs via the contact form with your project brief. We respond within one business day.
Process
From brief to handover.
Brief us early.
A 15-minute call during DD or early CD is enough. Share the brief — number of bathrooms, water source, project location — and we send back a tentative system spec for your drawings.
Spec into the drawings.
We supply DWG footprints, BIM blocks, and install-location drawings sized to your project. Your team integrates them into plumbing, electrical, and structural sheets.
Site survey + free water test.
Before installation begins, our engineer visits the site, runs the water test, and confirms the design. Adjustments documented and shared with your team.
Install + handover + AMC.
Our team installs, commissions, and signs off the system. Comprehensive AMC starts at handover. Your client gets the same engineering team for the next decade.
Named manufacturers, every project.
FRP and SS316 vessels rated for the duty cycle. RO membranes from Hydranautics, Dow, LG. Resins from Tulsion and Ionex. Pumps from Wilo and Grundfos. Listed on every quote.
The fittings you specified deserve the water they were engineered for.
Specify Uniwater into your next project.
Send your brief — bathrooms, water source, project location. We respond within one business day with a tentative system spec for your drawings.
Or call +91 97487 45193