
For architects & interior designers
Engineered home water, specified into the build.
Pre-tile design. DWG, BIM, install drawings. A single survey-led partner from villa-level treatment to mid-rise WTP. So the fittings you specified perform the way the brand intended.
Are you a plumber or installer instead? Visit the plumber program →
Why specify Uniwater
Three things specifiers actually need.
Spec into the plan, not after tile.
Designed during construction, the system routes cleanly and stays invisible. Specified after tile is repair work.
A single supplier across the build.
One survey, one BOM, one handover, one AMC — from BathSoft to building-inlet WTP. Not three vendors.
Documentation that holds up to scrutiny.
DWG, BIM, install drawings, submittal-grade PDFs. Version-controlled, available before tender.
Spec library
Everything you need on your drawings.
DWG, BIM, install drawings, technical PDFs. Submittal-grade, version-controlled, shared by email on request. A self-serve partner portal is in development.
DWG and PDF, every capacity from BathSoft Mono to HomeSoft 6K and the 8K–30K LPH building bands.
Revit families for the residential and building plant capacities. Layered for plumbing, electrical, structural.
Architectural sections of the five install patterns — false ceiling, plumbing shaft, wall recess, under-counter, utility room.
What to test, when to test, what plumbing routes to leave open, what utility-room dimensions to plan for.
Per-product data sheets with capacities, materials, dimensions, AMC scope. Submittal-ready.
Bundled assets per project type — villa, mid-rise, gated complex, boutique hotel.
Request packs via the contact form with your project brief. We respond within one business day.
Process
From brief to handover.
Brief us early.
A 15-minute call at DD or early CD. Share bathrooms, water source, project location — we send back a tentative system spec.
Spec into the drawings.
DWG footprints, BIM blocks, install-location drawings sized to your project. Your team integrates into plumbing, electrical, structural sheets.
Site survey + free water test.
Engineer visits site, tests water, confirms design. Adjustments documented and shared.
Install + handover + AMC.
We install, commission, sign off. Comprehensive AMC starts at handover. Same team for the next decade.
Named manufacturers, every project.
FRP and SS316 vessels rated for the duty cycle. RO membranes from Hydranautics, Dow, LG. Resins from Tulsion and Ionex. Pumps from Wilo and Grundfos. Listed on every quote.
The fittings you specified deserve the water they were engineered for.
Your next step
Specify Uniwater into your next project.
Send your brief — bathrooms, water source, project location. We respond within one business day with a tentative system spec for your drawings.
